Construction Closure for Black Star Mon-Fri

Discussion in 'Trail Conditions' started by genusmtbkr5, Nov 23, 2011.

  1. D man

    D man Ride til u smile

    Joined:
    May 31, 2011
    Messages:
    207
    Likes Received:
    0
    Trophy Points:
    0
    Location:
    OC
    I haven't been back since my last trip, but i'm itching to go ride B*. If they are on (there spoken) schedule this should be the week for the 3rd bridge and it most likely will be closed. But if some one wants to check it out I would appreciate it.
     
  2. D man

    D man Ride til u smile

    Joined:
    May 31, 2011
    Messages:
    207
    Likes Received:
    0
    Trophy Points:
    0
    Location:
    OC
    Rode B* tonight and just wanted to let people know it is open and passable on week days now. I don't know if it is open during the day as it looks like there is still some construction going on, but evening or later rides are good.
     
  3. SXP

    SXP Member

    Joined:
    Nov 2, 2011
    Messages:
    104
    Likes Received:
    0
    Trophy Points:
    16
    Occupation:
    Electrical Engineer
    Location:
    Huntington Beach, Ca
    On Friday (1/27), at 4:30 am (trying out my TrailTech HID light), the gate had a big sign in front saying it was closed to pedestrian and bike traffic. I detoured to Maple Springs instead. The trail was open for use the next day (Saturday) when I rode Neil's Saturday Path ride. All the bridges had steel plates over them. Based on D Man's report above, it sounds like they are not restricting weekday traffic anymore.
     
  4. genusmtbkr5

    genusmtbkr5 STR Moderator

    Joined:
    Mar 5, 2007
    Messages:
    8,618
    Likes Received:
    3
    Trophy Points:
    38
    Gender:
    Male
    Occupation:
    Lead Aircraft Mechanic for Major Airline at LAX
    Location:
    South Bay/Pedro

    He did a night ride so D Man probably headed out there after the crews stopped work for the day. In the orginal post, construction work was between 7am-3:30pm.

     
  5. dcrfx

    dcrfx Member

    Joined:
    Aug 10, 2011
    Messages:
    970
    Likes Received:
    5
    Trophy Points:
    18
    Location:
    South O.C.
    Last Thurs 1/26 talked to a mtnbiker at Cooks around 10am. He had been to B* but said it was closed so was at Cooks to do STT. Not sure how long that will be the case during the day... --Dave
     
  6. D man

    D man Ride til u smile

    Joined:
    May 31, 2011
    Messages:
    207
    Likes Received:
    0
    Trophy Points:
    0
    Location:
    OC
    The steel plates are still covering the transitions from the bridges to the road which leeds me to believe that there is work happening during day time hours, So I would be uncertain of weekday closures or passability. I saw it was open so I hurried through the gate, sorry I didn't look at the signs to closely just to see if the CLOSED sign was in place or not. its gone. The bridges are rebuilt wich was the reason for the complete closure the last few weeks.
     

Share This Page

Help keep STR alive, please click the donation button below