Go Back   SoCalTrailRiders > Local Riding > Trailhead

Trailhead Meet up with other socal mountain bikers to organize group rides.

Reply
 
Thread Tools
Old 08-02-2007, 03:07 PM   #1 (permalink)
Oz
 
osmarandsara's Avatar
 
Default 8:00 A.m. SART

I plan to ride SART on Saturday 8:00 a.m. start time.

Ride details: Meet at post office....however will drive down Middle Control and park at the bottom of canyon. Ride back up middle control to post office, down the first SART section back to middle control, then Seven Oaks Road to River Road up to South Fork and then SART back down to the cars.

Approximately mileage 30 miles. Ride time 3-4 hrs.

I believe that you need an Adventure Pass to park on middle control.. please let me know if you can attend osmarandsara@sbcglobal.net
osmarandsara is offline
Reply
  SoCalTrailRiders > Local Riding > Trailhead

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

Similar Threads
Thread Thread Starter Forum Replies Last Post
RR: SART 4-22 & Art Smith 4-20 jfsh Trail Talk 4 04-24-2007 10:03 PM
Great SART ride! mtnbikerdude87 Trail Talk 9 12-02-2006 08:18 PM
Cancelled: SART on 12/17 or 12/18? DtEW Trailhead 7 12-15-2005 10:24 PM
SART ON SATURDAY chumbaracing Trailhead 19 08-23-2005 10:16 PM
sart is all clear Tom Cosgrove Trail Talk 0 08-20-2005 06:17 PM

Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.2.0 RC7


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84