Go Back   SoCalTrailRiders > Local Riding > Trailhead

Trailhead Meet up with other socal mountain bikers to organize group rides.

 
Thread Tools
 
Letyrides
STR Veteran
 
Letyrides's Avatar
 
Default 50 Mile Ride

Here is some info for an upcoming ride. I'll be doing "The Cruise" and probably some volunteer work.

when: Saturday, December 30
where: Staging at Cook's Corner
time: Check-in begins @ 6:30 AM, ride starts @ 7:00 AM
distance: 50 miles off-road - (25 mile option also available)
Entry Fee: $25

50 Mile Ride - 50 Miles For 50 Bikes - December 30, 2006

First leg "The Climb": 25.8 miles, 4000' gain, 7 am start.
Second leg "The Cruise": 24.2 miles, 2700' gain, 10 am start.
Ride one, or ride them both for the full "50 Miler"

Post ride celebration from 2 PM to 5 PM - BBQ, live band, raffle
 
Evel Knievel
STR Veteran
 
Evel Knievel's Avatar
 
Default

Never mind.

Last edited by Evel Knievel : 11-21-2006 at 08:35 PM. Reason: link discovered
 
CalEpic
Col. Clink
 
CalEpic's Avatar
 
Default

This sounds pretty cool. Let's get a big STR group doing this.

C
 
Pain Freak
Directionally Challenged
 
Pain Freak's Avatar
 
Default

If I'm not in Sedona, I'd jump on this in a second. But I've been trying to get back to Sedona all year and the trip is planned for that week.
__________________
"The best rides are the ones where you bite off much more than you can chew—and live through it." — Doug Bradbury

"When I was a kid I used to pray every night for a new bicycle. Then I realised that the Lord doesn't work that way so I stole one and asked Him to forgive me." — Emo Philips
 
LBmtb
good times
 
LBmtb's Avatar
 
Default

Quote:
Originally Posted by Letyrides View Post
Here is some info for an upcoming ride. I'll be doing "The Cruise" and probably some volunteer work.

when: Saturday, December 30
where: Staging at Cook's Corner
time: Check-in begins @ 6:30 AM, ride starts @ 7:00 AM
distance: 50 miles off-road - (25 mile option also available)
Entry Fee: $25

50 Mile Ride - 50 Miles For 50 Bikes - December 30, 2006

First leg "The Climb": 25.8 miles, 4000' gain, 7 am start.
Second leg "The Cruise": 24.2 miles, 2700' gain, 10 am start.
Ride one, or ride them both for the full "50 Miler"

Post ride celebration from 2 PM to 5 PM - BBQ, live band, raffle
I'll go if you go. But if Dell doesn't go I won't go. Although if Aldo and Pat go I'll go even if Dell doesn't go.
STR sponsored links
Reply
  SoCalTrailRiders > Local Riding > Trailhead

Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Rosarito to Ensenada 50 mile fun ride dukethenuke Racing and Training 16 04-21-2006 06:00 PM
Turkey Ride: Thursday; November 24th Epic_Mtn_Biker Trailhead 31 12-13-2005 07:13 PM
LONG ride Sun Dec 4th.- B-Star/Silverado & Maple/Silvera singleSSpeedster Trailhead 11 12-04-2005 08:08 PM
Rosarito to Ensenada 50 Mile Fun Ride Epic_Mtn_Biker Trailhead 4 09-24-2005 09:40 PM
Rosarito to Ensenada 50 mile fun ride Epic_Mtn_Biker General Discussion 0 05-03-2005 08:22 PM


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75