STR | SocalTrailRiders.org
Your Southern California
Mountain Biking Community
|
|
#1 (permalink) |
|
STR Veteran
|
SDMBA Trail Work on Indian Creek Trail
Saturday, January 5th @ 8:30 am Join us for trail work on Indian Creek Trail in the Laguna Recreation Area, Saturday the 5th. We will be brushing back the trail from the trail head up to the Waterfall, this part of the trail has not been worked on in years and is long over due for some attention. Meet at 8:30 a.m. at the lower Noble Canyon trail head parking lot in Pine Valley, we will carpool to the work location. Bring the usual: water, (warm clothing recommended) sturdy shoes, gloves, eye protection and a snack. All tools and training will be provided. We'll work till 1:00 p.m., pass out some well earned swag courtesy of Cal Coast Bicycles. Please R.S.V.P., email Mark, so we have an idea how many tools will be required. Directions: I-8 East to Pine Valley Exit, left on Old Hwy 80 to Pine Creek Road, right into trailhead parking lot. Forest Adventure Pass required. |
|
|
|
|
#5 (permalink) |
|
STR Veteran
|
Just in from the SDMBA trail News
Due to the upcoming winter storms (90% chance of rain) the trailwork this Saturday on Indian Creek is postponed until further notice. Thanks to all those who RSVP'd, we were going to have a good volunteer showing! With the upcoming rain SDMBA urges all riders to stay off off the trails until they have dried, many of our favorite trails are turning into wide & rutted erosion control problems severly increasing the amount trail maintenace and has some Land Managers considering temporary closures. Next SDMBA trail work is La Costa Open Space Preserve January 19th. RSVP & info: richard@sdmba.com
__________________
"Keep it singletrack” stay on the trail to avoid widening the trail, on narrow singletrack stop and lean the bike to one side to allow others to pass. SDMBA |
|
|
![]() |
|
|
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| SDMBA - Trail Work - Indian Creek Trail | Hecklermark | Trailhead | 1 | 10-12-2007 08:06 AM |
| Trail Work Report: Waterworks Re-Route | KeepsWhatHappens | Ride Reports | 19 | 09-16-2007 02:04 PM |
| RR: Mt. Zion/Chantry Flats (incl. trail work) | gurp13 | Ride Reports | 17 | 12-05-2006 07:08 PM |
| Mt. Zion Trail Maintenance Part 2 - 6/10 | MTBMaven | General Discussion | 7 | 06-10-2006 06:09 PM |
| Trail Work | JamR | Ride Reports | 1 | 12-16-2005 02:19 PM |
Powered by vBulletin® Version 3.7.1
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.2.0 RC7
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.2.0 RC7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180







